Hwy 7/29 Montevideo Corridor and Bridge Study
Study overview
MnDOT is studying Hwy 7/29 from Canton Ave./Co. Hwy 15 to Benson Rd./8th St., with a focus on the 1st St. and 3rd St. bridges over the highway. Through detailed review and public engagement, MnDOT is working to better understand how each bridge supports local travel and community connections, as well as how potential future changes could impact Montevideo’s transportation network for people walking, biking, rolling, and driving. The study will use these findings to develop recommendations for future bridge projects.
The goals of the study are to:
- Gather input from the local community and businesses who use the bridges and the surrounding area.
- Identify safety, accessibility, and connectivity needs of people walking, biking, driving and using other forms of transportation.
- Provide meaningful opportunities to collect feedback from a broad and diverse range of community members.
- Share information about current road and bridge conditions, possible improvement options and study decisions.
- Use community feedback to inform bridge, roadway, pedestrian and bicycle recommendations.
Questions & feedback
What comments or questions do you have about the study? Please leave your name and contact information if you'd like to receive a response directly from the study team.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends