Hwy 7/29 Montevideo Corridor and Bridge Study

Share Hwy 7/29 Montevideo Corridor and Bridge Study on Facebook Share Hwy 7/29 Montevideo Corridor and Bridge Study on X (formerly Twitter) Share Hwy 7/29 Montevideo Corridor and Bridge Study on Linkedin Email Hwy 7/29 Montevideo Corridor and Bridge Study link

Study overview

MnDOT is studying Hwy 7/29 from Canton Ave./Co. Hwy 15 to Benson Rd./8th St., with a focus on the 1st St. and 3rd St. bridges over the highway. Through detailed review and public engagement, MnDOT is working to better understand how each bridge supports local travel and community connections, as well as how potential future changes could impact Montevideo’s transportation network for people walking, biking, rolling, and driving. The study will use these findings to develop recommendations for future bridge projects.

The goals of the study are to:

  • Gather input from the local community and businesses who use the bridges and the surrounding area.
  • Identify safety, accessibility, and connectivity needs of people walking, biking, driving and using other forms of transportation.
  • Provide meaningful opportunities to collect feedback from a broad and diverse range of community members.
  • Share information about current road and bridge conditions, possible improvement options and study decisions.
  • Use community feedback to inform bridge, roadway, pedestrian and bicycle recommendations.

Study overview

MnDOT is studying Hwy 7/29 from Canton Ave./Co. Hwy 15 to Benson Rd./8th St., with a focus on the 1st St. and 3rd St. bridges over the highway. Through detailed review and public engagement, MnDOT is working to better understand how each bridge supports local travel and community connections, as well as how potential future changes could impact Montevideo’s transportation network for people walking, biking, rolling, and driving. The study will use these findings to develop recommendations for future bridge projects.

The goals of the study are to:

  • Gather input from the local community and businesses who use the bridges and the surrounding area.
  • Identify safety, accessibility, and connectivity needs of people walking, biking, driving and using other forms of transportation.
  • Provide meaningful opportunities to collect feedback from a broad and diverse range of community members.
  • Share information about current road and bridge conditions, possible improvement options and study decisions.
  • Use community feedback to inform bridge, roadway, pedestrian and bicycle recommendations.
  • Let's visit!

    Share Let's visit! on Facebook Share Let's visit! on X (formerly Twitter) Share Let's visit! on Linkedin Email Let's visit! link
    supporting image

    We had a wonderful time connecting with students and their families at the Montevideo High School Career Fair! Thank you to everyone who stopped by to learn more about the study, ask questions, and share in the conversation.

    We'll be back soon for a Public Open House at Montevideo Middle School on Thursday, November 19, from 4:00 to 6:00 p.m.

    Stop by at any time during the open house to learn more about the corridor and bridge study and share your feedback. Your input will help shape the future of the corridor and guide future improvements.

    We look forward to seeing you there!

    We had a wonderful time connecting with students and their families at the Montevideo High School Career Fair! Thank you to everyone who stopped by to learn more about the study, ask questions, and share in the conversation.

    We'll be back soon for a Public Open House at Montevideo Middle School on Thursday, November 19, from 4:00 to 6:00 p.m.

    Stop by at any time during the open house to learn more about the corridor and bridge study and share your feedback. Your input will help shape the future of the corridor and guide future improvements.

    We look forward to seeing you there!

Page last updated: 20 Nov 2026, 06:37 PM