Hwy 61- Resurfacing in Duluth

Share Hwy 61- Resurfacing in Duluth on Facebook Share Hwy 61- Resurfacing in Duluth on Twitter Share Hwy 61- Resurfacing in Duluth on Linkedin Email Hwy 61- Resurfacing in Duluth link

About the project

View full-size mapView full-size image

In 2029, MnDOT plans to resurface Hwy 61 in Duluth from the Lester River bridge to just past the Superior Street intersection. This project has been in the MnDOT Capital Highway Investment Plan (CHIP) since 2018. Engagement was tabled until now so it wouldn't be confused with the London Road project from 26th Avenue East to 60th Avenue East. This project includes studies at the Superior Street and Congdon Boulevard/Scenic 61 intersections, and improvements may be included at those intersections.

Benefits

  • Improve safety
  • Provide smoother road surface
  • Extend pavement life
  • Reduce maintenance upkeep and costs
  • Possible intersection improvements

About the project

View full-size mapView full-size image

In 2029, MnDOT plans to resurface Hwy 61 in Duluth from the Lester River bridge to just past the Superior Street intersection. This project has been in the MnDOT Capital Highway Investment Plan (CHIP) since 2018. Engagement was tabled until now so it wouldn't be confused with the London Road project from 26th Avenue East to 60th Avenue East. This project includes studies at the Superior Street and Congdon Boulevard/Scenic 61 intersections, and improvements may be included at those intersections.

Benefits

  • Improve safety
  • Provide smoother road surface
  • Extend pavement life
  • Reduce maintenance upkeep and costs
  • Possible intersection improvements
  • Survey results

    Share Survey results on Facebook Share Survey results on Twitter Share Survey results on Linkedin Email Survey results link
    supporting image

    Thank you for taking the time to comment on the interactive map. View results of the comments.

Page last updated: 06 Mar 2024, 09:30 AM