Hwy 61- Resurfacing in Duluth
About the project
In 2029, MnDOT plans to resurface Hwy 61 in Duluth from the Lester River bridge to just past the Superior Street intersection. This project has been in the MnDOT Capital Highway Investment Plan (CHIP) since 2018. Engagement was tabled until now so it wouldn't be confused with the London Road project from 26th Avenue East to 60th Avenue East. This project includes studies at the Superior Street and Congdon Boulevard/Scenic 61 intersections, and improvements may be included at those intersections.
Benefits
- Improve safety
- Provide smoother road surface
- Extend pavement life
- Reduce maintenance upkeep and costs
- Possible intersection improvements
Community survey
Thank you for taking the time to post comments and concerns on the corridor map. The comment map closed on Jan. 19, 2024, and a summary of information gathered has been posted on this site.