I-694 study – Brooklyn Center to Arden Hills

Share I-694 study – Brooklyn Center to Arden Hills on Facebook Share I-694 study – Brooklyn Center to Arden Hills on X (formerly Twitter) Share I-694 study – Brooklyn Center to Arden Hills on Linkedin Email I-694 study – Brooklyn Center to Arden Hills link

About this study

We are studying I-694 between Brooklyn Blvd. in Brooklyn Center and Lexington Ave. in Arden Hills. This 9-mile section of I-694 is one of the most heavily traveled and congested areas in the Metro. Drivers experience delays throughout the day, and several locations have higher than average crash rates. Safety and connectivity are a concern for people walking, biking and rolling in the area.

This study will review existing conditions, collect public input, identify safety and connectivity needs for all users and recommend ideas to guide short-term and long-term improvements.

Interstate 694 between Brooklyn Boulevard in Brooklyn Center and Lexington Avenue in Arden Hills study location map View full-size map

Summary of work

  • Understand current conditions
  • Engage people, businesses and community partners to identify needs
  • Propose options that respond to needs
  • Identify funding sources, timelines and processes to achieve various proposed options

Get involved

As a part of this study, we will be gathering input from community through public meetings, events and surveys.

About this study

We are studying I-694 between Brooklyn Blvd. in Brooklyn Center and Lexington Ave. in Arden Hills. This 9-mile section of I-694 is one of the most heavily traveled and congested areas in the Metro. Drivers experience delays throughout the day, and several locations have higher than average crash rates. Safety and connectivity are a concern for people walking, biking and rolling in the area.

This study will review existing conditions, collect public input, identify safety and connectivity needs for all users and recommend ideas to guide short-term and long-term improvements.

Interstate 694 between Brooklyn Boulevard in Brooklyn Center and Lexington Avenue in Arden Hills study location map View full-size map

Summary of work

  • Understand current conditions
  • Engage people, businesses and community partners to identify needs
  • Propose options that respond to needs
  • Identify funding sources, timelines and processes to achieve various proposed options

Get involved

As a part of this study, we will be gathering input from community through public meetings, events and surveys.

  • Study update – August 2026

    Share Study update – August 2026 on Facebook Share Study update – August 2026 on X (formerly Twitter) Share Study update – August 2026 on Linkedin Email Study update – August 2026 link

    This summer, we asked community members to share their experiences driving, walking, biking and rolling along and across I-694. During this process, we connected with hundreds of people at events across three counties and during the virtual public meeting, and received 1,540+ survey responses and 155+ comments on the online map.

    The online survey and comment map closed on Sun, Aug. 23 and we’re grateful for the time community members took to share their feedback. This information will help us develop ideas for improvements that enhance connections and increase safety for people who drive, walk, bike and roll in the

    This summer, we asked community members to share their experiences driving, walking, biking and rolling along and across I-694. During this process, we connected with hundreds of people at events across three counties and during the virtual public meeting, and received 1,540+ survey responses and 155+ comments on the online map.

    The online survey and comment map closed on Sun, Aug. 23 and we’re grateful for the time community members took to share their feedback. This information will help us develop ideas for improvements that enhance connections and increase safety for people who drive, walk, bike and roll in the area. We’ll return in Winter 2026 to share emerging concepts.

    If you couldn’t participate in the survey or couldn’t attend a community event or the virtual meeting, you can still share your thoughts. Leave a comment and send us questions or reach out to the study team.

    You can also watch the online public meeting recording to learn more about the study.

    Sign up for email updates to stay informed and learn about future opportunities to share your input.

  • Meetings and events

    Share Meetings and events on Facebook Share Meetings and events on X (formerly Twitter) Share Meetings and events on Linkedin Email Meetings and events link

    Public meetings and events

    Upcoming

    Information on upcoming meetings will be posted as details become available. Sign up for email updates to receive information on upcoming meetings and opportunities to provide feedback on this study.

    Past

    Aug. 12, 2026: Virtual public meeting

    Aug. 11, 2026: In-person outreach, New Brighton Park Discovery Days, New Brighton

    July 28, 2026: In-person outreach, Fridley Summer Concert Series, Fridley

    July 23, 2026: In-person outreach, Monarch Festival, Columbia Heights

    July 21, 2026: In-person outreach, Shoreview Farmers’ Market, Shoreview

    July 17, 2026: In-person outreach, Arden Hills 75th Celebration, Arden Hills


    Public meeting

    Public meetings and events

    Upcoming

    Information on upcoming meetings will be posted as details become available. Sign up for email updates to receive information on upcoming meetings and opportunities to provide feedback on this study.

    Past

    Aug. 12, 2026: Virtual public meeting

    Aug. 11, 2026: In-person outreach, New Brighton Park Discovery Days, New Brighton

    July 28, 2026: In-person outreach, Fridley Summer Concert Series, Fridley

    July 23, 2026: In-person outreach, Monarch Festival, Columbia Heights

    July 21, 2026: In-person outreach, Shoreview Farmers’ Market, Shoreview

    July 17, 2026: In-person outreach, Arden Hills 75th Celebration, Arden Hills


    Public meeting accommodations

    MnDOT invites and encourages participation by all people in their programs, services and activities. If you need an ASL, a foreign language interpreter, or documents in an alternative format (such as braille, large print or in a different language) at no cost, please email your request to Janet Miller at ADArequest.dot@state.mn.us or call 651-366-4720. Relay service: 711.

    If you need any other reasonable accommodation to participate (such as seating modification or auxiliary aids), please email your request to Accessibility.DOT@state.mn.us or call 1-833-400-8432. Relay service: 711

  • Accessibility

    Share Accessibility on Facebook Share Accessibility on X (formerly Twitter) Share Accessibility on Linkedin Email Accessibility link

    Americans with Disabilities Act

    Hand pressing ADA accessible walk signal button
    Speakers and raised arrows on APS signals provide information about the intersection to pedestrians with hearing and visual impairment.

    All MnDOT - both new construction and rehabilitation projects - must include evaluation to ensure compliance with the Americans with Disabilities Act. Components can include, but are not limited to adding curb cuts, truncated domes and accessible pedestrian signals. Read about MnDOT's transition plan to comply with the ADA.


    Specifics for this study

    • Determine what accessibility improvements are needed for a 2032 construction project.

    Americans with Disabilities Act

    Hand pressing ADA accessible walk signal button
    Speakers and raised arrows on APS signals provide information about the intersection to pedestrians with hearing and visual impairment.

    All MnDOT - both new construction and rehabilitation projects - must include evaluation to ensure compliance with the Americans with Disabilities Act. Components can include, but are not limited to adding curb cuts, truncated domes and accessible pedestrian signals. Read about MnDOT's transition plan to comply with the ADA.


    Specifics for this study

    • Determine what accessibility improvements are needed for a 2032 construction project.
Page last updated: 27 Aug 2026, 05:46 AM