Hwy 68 - Ghent Complete Streets Assessment
In 2026, MnDOT will conduct a Complete Streets Assessment to understand how the Hwy 68 corridor in the city of Ghent from 320th Street (County Road 8) to Maskel St is used today and how it can better serve everyone who travels, walks, bikes, rolls, or drives along it.
In 2026, MnDOT will conduct a Complete Streets Assessment to understand how the Hwy 68 corridor in the city of Ghent from 320th Street (County Road 8) to Maskel St is used today and how it can better serve everyone who travels, walks, bikes, rolls, or drives along it.
As part of this assessment, MnDOT will:
- Review existing roadway and transportation conditions
- Work with community members and local partners to learn about current needs and experiences
- Develop potential roadway layout options that support safe and comfortable travel for all users
- Create early concept drawings to help illustrate and discuss possible future improvements
At this time, there is no funding or construction planned for this corridor. This assessment will help build a shared understanding of the corridor and guide future planning and decision‑making.
Assessment Goals:
- Evaluate existing conditions (traffic volumes, travel speeds, intersections, crashes, safety, etc.)
- Develop roadway design options for the corridor and create clear sketches to help share these design options with residents and property owners.
- Facilitate discussion between local partners, stakeholders, and the public.
- Provide recommendations to improve safety and mobility for all roadway users.
- Plan and create an early roadway layout for all roadway users and addresses Americans with Disabilities Act (ADA) needs.
Get involved
- Take the survey
- Place a pin on the comment map
- Ask the project team a question

-
What We Heard at the City of Ghent's Belgian-American Days
Share What We Heard at the City of Ghent's Belgian-American Days on Facebook Share What We Heard at the City of Ghent's Belgian-American Days on X (formerly Twitter) Share What We Heard at the City of Ghent's Belgian-American Days on Linkedin Email What We Heard at the City of Ghent's Belgian-American Days linkMnDOT conducted a public engagement event for the Hwy 68 Complete Streets Assessment during the City of Ghent's Belgian-American Days, an annual celebration of the community's Belgian heritage. The purpose of the event was to gather input from Ghent residents and others who are potentially affected by future changes in the corridor.

The following themes emerged from public feedback:
- Chapman Street (County Road 5): Residents expressed a desire for a safer pedestrian crossing at the intersection of Hwy 68 and Chapman Street. Additional concerns included high vehicle speeds, particularly south of Chapman Street near residential areas, and the bumpy roadContinue reading
MnDOT conducted a public engagement event for the Hwy 68 Complete Streets Assessment during the City of Ghent's Belgian-American Days, an annual celebration of the community's Belgian heritage. The purpose of the event was to gather input from Ghent residents and others who are potentially affected by future changes in the corridor.

The following themes emerged from public feedback:
- Chapman Street (County Road 5): Residents expressed a desire for a safer pedestrian crossing at the intersection of Hwy 68 and Chapman Street. Additional concerns included high vehicle speeds, particularly south of Chapman Street near residential areas, and the bumpy road, which creates discomfort for drivers pulling trailers.
- Maskel Street: Participants identified a need for improved safety in addition to pedestrian safety and bicycle infrastructure. This is at least in part due to the presence of a community trail network that crosses at Maskel.
- Collins Street: Several attendees requested enhanced bicycle and pedestrian accommodations. One of the factors behind this location is that Collins is the outlet to a residential development, acting as a funnel for pedestrians to the Hwy 68 corridor.
- AGPlus Depot on Hwy 68: Residents expressed concerns about truck movements near the depot and the potential safety impacts on other roadway users.
Additional Feedback
- Speed: Most attendees did not express concerns about vehicle speeds within Ghent. Cars slow down as they approach Ghent and some attribute this to the presence of the Sheriff vehicles on Hwy 68 and the dynamic speed display at Maskel Street.
- Roundabouts: Opinions on roundabouts were mixed. One attendee supported a roundabout at Chapman Street, while another opposed adding roundabouts anywhere along Hwy 68.
- Visibility: Several attendees noted that the “hill” on Hwy 68 on the east side of Ghent. Especially for motorists coming into Ghent, there is a concern about limited visibility for entering the community.
- Rectangular Rapid Flashing Beacon (RRFB): Although attendees generally felt comfortable walking and bicycling along the corridor, several suggested that installing an RRFB (or similar type of warning device) would improve safety by alerting motorists when pedestrians or bicyclists are crossing Hwy 68.
One attendee completed a paper survey. The respondent indicated that traffic speeds are appropriate and that large trucks and farm equipment are able to navigate the corridor without difficulty.





-
Upcoming events
Share Upcoming events on Facebook Share Upcoming events on X (formerly Twitter) Share Upcoming events on Linkedin Email Upcoming events link
We’ll be at Belgian American Days in Ghent on Saturday, August 1. Stop by and visit with us—we’d love to chat about the Hwy 68 corridor study and hear your thoughts.
We’ll be at Belgian American Days in Ghent on Saturday, August 1. Stop by and visit with us—we’d love to chat about the Hwy 68 corridor study and hear your thoughts.
-
Summer 2026
Hwy 68 - Ghent Complete Streets Assessment is currently at this stage- Collect data on current roadway segment
- Gather feedback from the community and local partners
-
Fall 2026
this is an upcoming stage for Hwy 68 - Ghent Complete Streets Assessment- Review community and local partner input
- Analyze current and future roadway conditions
- Identify potential roadway design options
-
Winter and Spring 2027
this is an upcoming stage for Hwy 68 - Ghent Complete Streets Assessment- Share conceptual improvements and recommendations
- Finalize the Complete Streets Assessment Report
- Share next steps
-
Phone 320-905-3056 Email christopher.nienaber@state.mn.us -
Public Engagement Coordinator/ Coordinadora de Participación Pública
Minnesota Department of Transportation
Phone 320-212-6132 Email melissa.hjelle@state.mn.us