Hwy 52 — Hader to Zumbrota study

Share on Facebook Share on Twitter Share on Linkedin Email this link

Study area map Highway 52 from Hader to ZumbrotaView full-size mapWe are conducting a PEL, or Planning and Environmental Linkages, study of the Hwy 52. The study is examining the corridor between Hader and Zumbrota. The goal is to investigate what Hwy 52 may look like in the future. This includes potential changes and an analysis of the impacts each choice may have.

Specific elements considered include:

  • Safety
  • Manage access
  • Freight movement
  • Agricultural needs
  • Congestion
  • Economic development
  • Community needs

The input will help the project team determine community values. It will also help inform the team as they look into specific changes. This study is being done in partnership with Goodhue County.

Design alternative feedback and survey summary

Thank you to everyone who provided comments and participated in the survey. This summer, MnDOT collected input from the public on eight proposed design alternatives.

Feedback was gathered through two pop-up events, a public meeting, and online engagement.

  • 95+ in-person event attendees
  • 1,400+ website visits
  • 542 social media interactions
  • 70 surveys submitted

A summary of the results can be found in under the news feed tab.

Study area map Highway 52 from Hader to ZumbrotaView full-size mapWe are conducting a PEL, or Planning and Environmental Linkages, study of the Hwy 52. The study is examining the corridor between Hader and Zumbrota. The goal is to investigate what Hwy 52 may look like in the future. This includes potential changes and an analysis of the impacts each choice may have.

Specific elements considered include:

  • Safety
  • Manage access
  • Freight movement
  • Agricultural needs
  • Congestion
  • Economic development
  • Community needs

The input will help the project team determine community values. It will also help inform the team as they look into specific changes. This study is being done in partnership with Goodhue County.

Design alternative feedback and survey summary

Thank you to everyone who provided comments and participated in the survey. This summer, MnDOT collected input from the public on eight proposed design alternatives.

Feedback was gathered through two pop-up events, a public meeting, and online engagement.

  • 95+ in-person event attendees
  • 1,400+ website visits
  • 542 social media interactions
  • 70 surveys submitted

A summary of the results can be found in under the news feed tab.

Share on Facebook Share on Twitter Share on Linkedin Email this link

What would you like us to know about Hwy 52?

about 1 year

Thousands of drivers use or cross Hwy 52 each day. What's working? What isn't working?

Use the comment map to pin point a place you had an experience (good or bad), have an idea or think there is something we should know about. 

Page last updated: 13 Sep 2023, 06:57 AM