Hwy 23 - Milaca

Share Hwy 23 - Milaca on Facebook Share Hwy 23 - Milaca on Twitter Share Hwy 23 - Milaca on Linkedin Email Hwy 23 - Milaca link

Project locations

  • Third Ave. SW (Milaca public schools) - roundabout
  • Central Ave. (Co. Rd. 36) - roundabout
  • First St. E - roundabout
  • SB Hwy 169 - three-quarter
  • NB Hwy 169 - roundabout
  • 10th/110th Ave. SE - right in/out
  • 105th Ave. (Co. Rd. 2) - roundabout

Design goals

  • Make things safer for all
  • Create spaces for people to walk and bike
  • Plan for the future to accommodate more people

Engagement goals

  • Feedback on pedestrian features such as paths, sidewalks, crosswalks, etc.

We heard from you, thank you!

  • Thanks for joining us at the open house on Tue, Sept. 26, 2023.
  • We received your comments on the map through Fri, Oct. 27, 2023.
  • We have reviewed the comments from the design survey which is now closed.

Project locations

  • Third Ave. SW (Milaca public schools) - roundabout
  • Central Ave. (Co. Rd. 36) - roundabout
  • First St. E - roundabout
  • SB Hwy 169 - three-quarter
  • NB Hwy 169 - roundabout
  • 10th/110th Ave. SE - right in/out
  • 105th Ave. (Co. Rd. 2) - roundabout

Design goals

  • Make things safer for all
  • Create spaces for people to walk and bike
  • Plan for the future to accommodate more people

Engagement goals

  • Feedback on pedestrian features such as paths, sidewalks, crosswalks, etc.

We heard from you, thank you!

  • Thanks for joining us at the open house on Tue, Sept. 26, 2023.
  • We received your comments on the map through Fri, Oct. 27, 2023.
  • We have reviewed the comments from the design survey which is now closed.
  • CLOSED: This survey has concluded.
    Take Survey
    Share Design survey on Facebook Share Design survey on Twitter Share Design survey on Linkedin Email Design survey link
Page last updated: 25 Mar 2024, 08:35 AM