Hwy 7 study — Hopkins to St. Bonifacius

Share Hwy 7 study — Hopkins to St. Bonifacius on Facebook Share Hwy 7 study — Hopkins to St. Bonifacius on Twitter Share Hwy 7 study — Hopkins to St. Bonifacius on Linkedin Email Hwy 7 study — Hopkins to St. Bonifacius link

About this study

We Highway 7 between Hopkins Crossroad and the Western Hennepin County line in St. Bonifacius study location mapView full-size mapare studying Hwy 7 from Hopkins Crossroad in Hopkins to the western Hennepin County line in St. Bonifacius.

This study will seek to understand the transportation needs of all users, identify opportunities for future improvements, establish a shared vision for improvement concepts among study partners, and develop and evaluate these concepts to inform the design of facilities that will be upgraded as part of a pavement resurfacing project planned for 2029 from Christmas Lake Rd. in Shoreview to 1 mile east of Mills St. in the City of St. Bonifacius.

From November 2021 through June 2022, a road safety audit was conducted on Hwy 7 from Hwy 100 in St. Louis Park to Carver Co. Rd. 33 in Hollywood Township. This audit recommended that a full planning study be completed to develop a plan for future improvements that includes access management, pedestrian and bicycle crossings, accessibility, highway signs, roadway signals, and lighting. This planning study will be informed in part by the road safety audit completed on this road.

Summary of work

  • Assess and document existing conditions
  • Ask people to share their transportation experiences and needs
  • Produce a document that identifies transportation needs and opportunities in the study area
  • Develop and evaluate recommended ideas for improvements, and get public input
  • Develop next steps for advancing the recommended improvements

Get involved

As a part of this planning study, we will be gathering input from community through public meetings, events and surveys.

About this study

We Highway 7 between Hopkins Crossroad and the Western Hennepin County line in St. Bonifacius study location mapView full-size mapare studying Hwy 7 from Hopkins Crossroad in Hopkins to the western Hennepin County line in St. Bonifacius.

This study will seek to understand the transportation needs of all users, identify opportunities for future improvements, establish a shared vision for improvement concepts among study partners, and develop and evaluate these concepts to inform the design of facilities that will be upgraded as part of a pavement resurfacing project planned for 2029 from Christmas Lake Rd. in Shoreview to 1 mile east of Mills St. in the City of St. Bonifacius.

From November 2021 through June 2022, a road safety audit was conducted on Hwy 7 from Hwy 100 in St. Louis Park to Carver Co. Rd. 33 in Hollywood Township. This audit recommended that a full planning study be completed to develop a plan for future improvements that includes access management, pedestrian and bicycle crossings, accessibility, highway signs, roadway signals, and lighting. This planning study will be informed in part by the road safety audit completed on this road.

Summary of work

  • Assess and document existing conditions
  • Ask people to share their transportation experiences and needs
  • Produce a document that identifies transportation needs and opportunities in the study area
  • Develop and evaluate recommended ideas for improvements, and get public input
  • Develop next steps for advancing the recommended improvements

Get involved

As a part of this planning study, we will be gathering input from community through public meetings, events and surveys.

  • Meetings

    Share Meetings on Facebook Share Meetings on Twitter Share Meetings on Linkedin Email Meetings link

    Public meetings and events

    Upcoming

    Information on upcoming meetings will be posted as details become available. Sign up for email updates to receive information on upcoming meetings and opportunities to provide feedback on this study.

    Public meeting accommodations

    MnDOT invites and encourages participation by all people in their programs, services and activities. If you need an ASL, a foreign language interpreter, or documents in an alternative format (such as braille, large print or in a different language) at no cost, please email your request to Janet Miller at ADArequest.dot@state.mn.us or call 651-366-4720. Relay service: 711.

    If you need any other reasonable accommodation to participate (such as seating modification or auxiliary aids), please email your request to Accessibility.DOT@state.mn.us or call 1-833-400-8432. Relay service: 711.

  • Accessibility

    Share Accessibility on Facebook Share Accessibility on Twitter Share Accessibility on Linkedin Email Accessibility link

    Americans with Disabilities ActSpeakers and raised arrows on APS signals provide information about the intersection to pedestrians with hearing and visual impairment.Speakers and raised arrows on APS signals provide information about the intersection to pedestrians with hearing and visual impairment.

    All MnDOT projects - both new construction and rehabilitation projects - must include evaluation to ensure compliance with the Americans with Disabilities Act. Components can include, but are not limited to adding curb cuts, truncated domes and accessible pedestrian signals. Read about MnDOT's transition plan to comply with the ADA.

    Specifics for this study


    • Determine what accessibility improvements are needed for a 2029 resurfacing project
Page last updated: 10 May 2024, 10:19 AM