View full-sized imageWe are planning to reconstruct portions of Hwy 16/Hwy 63 and make ADA improvements. Construction is anticipated to occur in 2030.

Improvements include:

Hwy 16/Hwy 63: Tracy Rd. to Griswold St. (Orange section)

  • Remove the road and replace it with new materials
  • Resolve drainage issues
  • Address safety concerns at several intersections
  • Replace sidewalks and make ADA updates
  • Improve pedestrian connections by constructing new sidewalks in locations where they do not currently exist

Hwy 63/Section Ave: Hwy 16/Hwy 63 intersection to Co. Rd. 12 (Blue section)

  • Pedestrian facility and ADA improvements
  • Sidewalk repairs
  • Improve drainage issues
  • Please note, at this time, this section will not receive changes to the roadway

Public meeting

Join the project team to learn about the proposed roadway and pedestrian improvements. The meeting is drop-in style, so no formal presentation is planned. People may visit and leave at their convenience.

Date: Tuesday, Oct. 13
Time: 4:30 – 6:30 p.m.
Location: Spring Valley Ambulance Service Building, 100 Emergency Drive, Spring Valley, MN 66975

Those who are unable to attend can review information that will be shared at the meeting and provide their feedback to the contacts listed on this website.

MnDOT invites and encourages participation by all. If you need an ASL, foreign language interpreter, or other reasonable accommodation, or need documents in an alternative format (such as braille or large print), please email your request to Janet Miller at ADArequest.dot@state.mn.us or call 651-366-4720 or 1-800-657-3774 (Greater Minnesota); 711 or 1-800-627-3529 (Minnesota Relay).

View full-sized imageWe are planning to reconstruct portions of Hwy 16/Hwy 63 and make ADA improvements. Construction is anticipated to occur in 2030.

Improvements include:

Hwy 16/Hwy 63: Tracy Rd. to Griswold St. (Orange section)

  • Remove the road and replace it with new materials
  • Resolve drainage issues
  • Address safety concerns at several intersections
  • Replace sidewalks and make ADA updates
  • Improve pedestrian connections by constructing new sidewalks in locations where they do not currently exist

Hwy 63/Section Ave: Hwy 16/Hwy 63 intersection to Co. Rd. 12 (Blue section)

  • Pedestrian facility and ADA improvements
  • Sidewalk repairs
  • Improve drainage issues
  • Please note, at this time, this section will not receive changes to the roadway

Public meeting

Join the project team to learn about the proposed roadway and pedestrian improvements. The meeting is drop-in style, so no formal presentation is planned. People may visit and leave at their convenience.

Date: Tuesday, Oct. 13
Time: 4:30 – 6:30 p.m.
Location: Spring Valley Ambulance Service Building, 100 Emergency Drive, Spring Valley, MN 66975

Those who are unable to attend can review information that will be shared at the meeting and provide their feedback to the contacts listed on this website.

MnDOT invites and encourages participation by all. If you need an ASL, foreign language interpreter, or other reasonable accommodation, or need documents in an alternative format (such as braille or large print), please email your request to Janet Miller at ADArequest.dot@state.mn.us or call 651-366-4720 or 1-800-657-3774 (Greater Minnesota); 711 or 1-800-627-3529 (Minnesota Relay).

Page last updated: 01 Oct 2026, 11:18 AM