Hwy 8 study – Chisago City to Taylors Falls

Share Hwy 8 study – Chisago City to Taylors Falls on Facebook Share Hwy 8 study – Chisago City to Taylors Falls on X (formerly Twitter) Share Hwy 8 study – Chisago City to Taylors Falls on Linkedin Email Hwy 8 study – Chisago City to Taylors Falls link

Study complete

About this study

We studied Hwy 8/Lake Blvd. from Chisago City to Taylors Falls to understand what needs and opportunities exist in the study area to inform future projects along the highway, including a pavement resurfacing project planned for 2033.

This study looked at ideas to improve vehicle safety and mobility, access management as well as safety and connectivity for people walking, biking, and rolling along and across the road. We engaged with local partners including Chisago County, Chisago City, City of Lindstrom, Center City, City of Shafer, City of Taylors Falls, and Chisago Lake, Shafer and Franconia Townships. Elected officials, residents, businesses, commuters, commercial operators, and other users were also engaged.

Highway 8 study map showing an orange line between Karmel Avenue in Chisago City and Highway 95 in Taylors FallsView full-size map

Summary of work

  • Assessed and documented existing conditions
  • Engaged with people to share their transportation experiences
  • Identified transportation needs and opportunities in the study area
  • Developed and evaluated recommended ideas for improvements and got public input
  • Developed next steps for advancing potential improvements
  • Created a project development plan to inform and guide future projects along Hwy 8

Read more about the study findings and next steps.

Study complete

About this study

We studied Hwy 8/Lake Blvd. from Chisago City to Taylors Falls to understand what needs and opportunities exist in the study area to inform future projects along the highway, including a pavement resurfacing project planned for 2033.

This study looked at ideas to improve vehicle safety and mobility, access management as well as safety and connectivity for people walking, biking, and rolling along and across the road. We engaged with local partners including Chisago County, Chisago City, City of Lindstrom, Center City, City of Shafer, City of Taylors Falls, and Chisago Lake, Shafer and Franconia Townships. Elected officials, residents, businesses, commuters, commercial operators, and other users were also engaged.

Highway 8 study map showing an orange line between Karmel Avenue in Chisago City and Highway 95 in Taylors FallsView full-size map

Summary of work

  • Assessed and documented existing conditions
  • Engaged with people to share their transportation experiences
  • Identified transportation needs and opportunities in the study area
  • Developed and evaluated recommended ideas for improvements and got public input
  • Developed next steps for advancing potential improvements
  • Created a project development plan to inform and guide future projects along Hwy 8

Read more about the study findings and next steps.

  • Study findings and next steps

    Share Study findings and next steps on Facebook Share Study findings and next steps on X (formerly Twitter) Share Study findings and next steps on Linkedin Email Study findings and next steps link

    Study purpose

    The Hwy 8 study identified needs and opportunities in the study area, and outlined improvements that could inform MnDOT’s planned 2033 pavement project. The study also brought together local partners to help build a coordinated, long‑term vision for future improvements as funding and opportunities arise.

    The study focused on determining improvements to safety and mobility along and across Hwy 8, managing access in ways that reflect local context and land use, and strengthening connections for people walking, biking or rolling.

    Study report

    The findings from the study are documented in the Final study report (PDF) and the Executive

    Study purpose

    The Hwy 8 study identified needs and opportunities in the study area, and outlined improvements that could inform MnDOT’s planned 2033 pavement project. The study also brought together local partners to help build a coordinated, long‑term vision for future improvements as funding and opportunities arise.

    The study focused on determining improvements to safety and mobility along and across Hwy 8, managing access in ways that reflect local context and land use, and strengthening connections for people walking, biking or rolling.

    Study report

    The findings from the study are documented in the Final study report (PDF) and the Executive summary (PDF).

    Who we heard from

    We conducted three phases of public engagement which included four public meetings, two surveys, seven pop-up events, stakeholder focus group meetings, as well as meetings with elected officials. In total, over 1,100 people were engaged throughout the study process. Community input helped identify existing issues and opportunities, inform the development and evaluation of alternatives and shape the final study recommendations.

    MnDOT also worked closely with representatives from Chisago County; the cities of Chisago City, Lindstrom, Center City, Shafer and Taylors Falls; Chisago Lake, Shafer and Franconia townships; the Chisago Lakes School District; regional agencies; and other stakeholders.

    Study needs

    Based on the existing conditions analysis and community engagement, the following needs were identified:

    • Safety for all modes of travel at intersections and crossings
    • Access management due to the number of existing conflict points and poor turning conditions
    • Mobility during peak hour traffic operations to improve travel time reliability for vehicles
    • Safe, accessible and comfortable facilities for people walking, biking and rolling
    • Protection and enhancement of community character across the study area’s varied land uses and development areas

    Recommended improvements and implementation

    MnDOT worked with communities and agency partners to identify potential safety, mobility and multimodal improvements for Highway 8, also known as alternatives. These alternatives ranged from small operational fixes like changes to signal timings to larger geometric changes such as roundabouts, and were developed using study goals, technical data and public input. Each alternative was evaluated for safety, mobility, multimodal access, environmental and property impacts and cost. These are planning‑level concepts, not final designs.

    The study also outlines a long‑term vision for Hwy 8. The improvement strategies are designed to work together and adapt as community needs, funding and opportunities change. Some strategies may align well with MnDOT’s planned 2033 pavement project, while others will require additional study, coordination or future funding. Together, they provide a process that supports both near‑term action and long‑term planning.

    Read more about the recommended improvements and implementation in the Final study report (PDF) and the Executive summary (PDF).

    What comes next

    The study has given MnDOT and local partners a shared understanding of current conditions of the study area, community priorities and long‑term needs along the study area.

    MnDOT will use the study to:

    • Document safety, mobility and access needs along Hwy 8
    • Coordinate with upcoming projects, including the planned 2033 pavement resurfacing
    • Support future project development, including funding discussions and prioritization
    • Continue working with local governments, community members and other partners to identify opportunities for improvement

    The study did not select final designs, commit funding or set construction timelines. Instead, it provides a foundation that will help guide future decisions. Improvements will move forward over time as priorities, partnerships and funding align.

  • Accessibility

    Share Accessibility on Facebook Share Accessibility on X (formerly Twitter) Share Accessibility on Linkedin Email Accessibility link

    Americans with Disabilities ActSpeakers and raised arrows on APS signals provide information about the intersection to pedestrians with hearing and visual impairment.
    Speakers and raised arrows on APS signals provide information about the intersection to pedestrians with hearing and visual impairment.

    All MnDOT projects - both new construction and rehabilitation projects - must include evaluation to ensure compliance with the Americans with Disabilities Act. Components can include, but are not limited to adding curb cuts, truncated domes and accessible pedestrian signals. Read about MnDOT's transition plan to comply with the ADA.

    Specifics for this study


    • Determine what accessibility improvements are needed for a 2033 construction project.

    Americans with Disabilities ActSpeakers and raised arrows on APS signals provide information about the intersection to pedestrians with hearing and visual impairment.
    Speakers and raised arrows on APS signals provide information about the intersection to pedestrians with hearing and visual impairment.

    All MnDOT projects - both new construction and rehabilitation projects - must include evaluation to ensure compliance with the Americans with Disabilities Act. Components can include, but are not limited to adding curb cuts, truncated domes and accessible pedestrian signals. Read about MnDOT's transition plan to comply with the ADA.

    Specifics for this study


    • Determine what accessibility improvements are needed for a 2033 construction project.
Page last updated: 24 Sep 2026, 11:18 AM