Transportation study

The Duluth-Superior Metropolitan Interstate Council worked with consultants to provide a transportation study of the corridor. Central Entrance was divided into five zones that roughly align with the surrounding land uses and roadway context. The five zones used in the plan were

  • Zone 1: Trinity Road to Anderson Road
  • Zone 2: Anderson Road to Basswood Avenue
  • Zone 3: Basswood Avenue to Arlington Avenue (County State Aid Highway [CSAH] 90)
  • Zone 4: Arlington Avenue (CSAH 90) to Blackman Avenue
  • Zone 5: Blackman Avenue to Mesaba Avenue (CSAH 4)