Share Highway 2 Corridor Study - Floodwood on FacebookShare Highway 2 Corridor Study - Floodwood on X (formerly Twitter)Share Highway 2 Corridor Study - Floodwood on LinkedinEmail Highway 2 Corridor Study - Floodwood link
MnDOT District 1 is leading a study to evaluate opportunities to improve the safety, mobility, accessibility, and operation of the intersections along the urban section of Hwy 2 through Floodwood.
The study will:
Review crash history and evaluate safety improvements at key intersections
Evaluate traffic data and traffic calming measures
Investigate improving bicycle, pedestrian, and transit facilities and crossings throughout the corridor
Facilitate discussions with stakeholders and the public to help drive improvement recommendations
Once completed, the study will recommend right-sized improvements for the intersections and corridor. The final report will document the study process, assumptions, methodology, analysis, findings, recommendations, and public involvement efforts. A geometric study layout will be developed to combine recommendations from the alternative's evaluation, including alignment changes, intersection revisions, cross section revisions, multimodal facility development, and access modifications.
Get involved
Use the comment box below to send us your questions and comments about the Floodwood Study.
MnDOT District 1 is leading a study to evaluate opportunities to improve the safety, mobility, accessibility, and operation of the intersections along the urban section of Hwy 2 through Floodwood.
The study will:
Review crash history and evaluate safety improvements at key intersections
Evaluate traffic data and traffic calming measures
Investigate improving bicycle, pedestrian, and transit facilities and crossings throughout the corridor
Facilitate discussions with stakeholders and the public to help drive improvement recommendations
Once completed, the study will recommend right-sized improvements for the intersections and corridor. The final report will document the study process, assumptions, methodology, analysis, findings, recommendations, and public involvement efforts. A geometric study layout will be developed to combine recommendations from the alternative's evaluation, including alignment changes, intersection revisions, cross section revisions, multimodal facility development, and access modifications.
Get involved
Use the comment box below to send us your questions and comments about the Floodwood Study.